HomeAbout UsProjectsMonitoring StationsWork With Us

Aerial Survey of Reservoir & Chaurjahari Settlement using Satellite, Drone & Remote Sensing

Bheri 4 Storage Hydroelectric Project (300 MW)
OngoingResearch ConsultingClimate Change
Aerial Survey of Reservoir & Chaurjahari Settlement using Satellite, Drone & Remote Sensing
Aerial Survey of Reservoir & Chaurjahari Settlement using Satellite, Drone & Remote SensingTaplejung, Terhathum, Jhapa, Rautahat, Bara, Sarlahi, Kapilbastu

About the Project

The Bheri 4 Storage Hydroelectric Project is a 300 MW hydropower scheme harnessing the combined catchment of the Bheri River and Chheda River in Karnali Province, western Nepal, with a design discharge of 275 m³/s across Surkhet, Salyan, Jajarkot and Rukum West districts.

What We Did

Hydrological modelling & flood forecasting system
SWAT and HEC-HMS ensemble models for 14 sub-catchments; 24-hour lead-time flood forecasting for 6 key gauge stations across the basin.

Have a similar project?

Contact our team to discuss how we can help deliver impactful results.

Get In Touch