Case study
Tsho Rolpa glacial lake — risk assessment to mitigation design
A detailed look at the scientific study, modelling approach and recommendations delivered to DHM for Nepal's highest-risk glacial lake.
Photos from the field
When DHM commissioned IES to design and install a 62-station early warning network across Province 2, the brief was simple: cover the flood-prone Terai belt before monsoon. The reality, as always, was more complicated.
Site selection alone took six weeks. Each candidate location was assessed for flood exposure, community accessibility, and — critically — a reliable line of sight for radio telemetry back to the district hub. Of the 90 sites originally scoped, 62 passed every criterion.
Getting the hardware right
Our field engineers standardised on a solar-powered sensor package built to survive the Terai's climate extremes. The final station specification included:
Solar-powered water-level sensor with battery backup rated for 10 days without sun
Tipping-bucket rainfall gauge, calibrated to local monsoon intensity
Dual-path GSM / radio telemetry — redundancy if the mobile network fails during a flood
Tamper-resistant, flood-rated enclosure rated to IP66
Local siren and light alarm, triggered independently of the central system
"The community handover mattered as much as the engineering. A station nobody trusts is a station nobody evacuates for."
— Field Team Lead, IES Monitoring & EWS unit
The study combined bathymetric survey, moraine-dam stability analysis and downstream inundation modelling to quantify the glacial lake outburst flood (GLOF) hazard.
Quick facts
Client
DHM, Govt. of Nepal
Location
Dolakha
Sector
Water Resources
More from
Insights & impact
Project story
Inside the Terai EWS rollout — 62 stations in nine months
Field notes from the DHM-commissioned early warning network across Province 2, from site selection to community handover.
532
Event
IES at the Nepal DRR & Climate Resilience Symposium 2025
Our hydrology and EWS teams presented findings on multi-hazard early warning design to government and donor partners.
22 Jan 2025 · Kathmandu
R&D finding
Improving sediment-flow calibration in mountain river EWS
Our in-house research lab's latest findings on refining sediment monitoring thresholds for more reliable flood forecasting.
Dec 2024 · Research Lab
Project story
Insight 5
Project story
Insight 6
Project story
Insight 7