About the Project
Bheri Energy Company Pvt. Ltd. engaged IES Nepal to carry out the foundational field survey and monitoring programme required for detailed engineering design: a detailed topographic survey of the 145-hectare dam and headworks area; installation of a staff gauge and discharge measurement at the dam site; and an intensive suspended sediment sampling and laboratory analysis programme on the Bheri River covering the full monsoon cycle.
Field work was executed between November 2017 and October 2018 across multiple mobilisations, capturing both dry-season and peak-monsoon hydrological and sediment conditions — data essential for turbine design optimisation, reservoir sedimentation modelling and environmental baseline documentation.
What We Did
Have a similar project?