About the Project
The Millennium Challenge Corporation (MCC) Nepal Electricity Transmission Project (ETP) is a major energy infrastructure programme that includes the construction of three new 400 kV indoor gas-insulated substations (GIS) at Ratmate in Belkotgadhi Municipality, Nuwakot District; New Damauli in Tanahun District; and New Butwal at Bhumahi in Nawalparasi West District. The transmission lines will also interconnect with existing Nepal Electricity Authority substations at Lapsiphedi in Bhaktapur District and New Hetauda in Makawanpur District.
IES Nepal was sub-contracted by CEMAT Consultant Pvt. Ltd. to carry out pavement investigation works along the access roads serving each of the three new GIS substation sites. The investigations provide the subgrade characterisation data — bearing capacity, material classification and compaction properties — required for the structural design of all-weather access roads capable of supporting heavy equipment movement during substation construction and long-term operational maintenance.
Field work was conducted across three provinces (Bagmati, Gandaki and Lumbini) spanning both hilly and Terai terrain conditions in December 2020 and January 2021, with laboratory analysis and reporting completed within the two-month contract period.
What We Did